This 300-foot PEX tubing kit provides oxygen-barrier tubing and installation accessories for compatible hydronic radiant floor heating systems. The kit includes 300 feet of 1/2-inch PEX tubing, two pipe bend supports, and 100 foam staples for securing tubing to suitable foam insulation.
Oxygen-barrier PEX is commonly used to circulate heated water through radiant floor loops. The oxygen barrier helps limit oxygen diffusion into the circulating fluid, which is particularly important in heating systems containing ferrous metal components. For additional tubing, insulation, and installation supplies, browse Barn World's radiant floor heating products.
300-Foot PEX Tubing Kit Specifications
| Specification | Details |
|---|---|
| Tubing length | 300 feet |
| Tubing size | 1/2 inch nominal |
| Tubing type | Oxygen-barrier PEX |
| Pipe bend supports | 2 included |
| Foam staples | 100 included |
| Application | Compatible hydronic radiant floor heating systems |
| Shipping | Two packages, per original listing |
Planning note: A 300-foot tubing length does not automatically correspond to 300 square feet of heated floor area. Actual coverage depends on tubing spacing, supply and return runs, manifold placement, heating requirements, and the system design.
What's Included in the Radiant Floor PEX Kit?
300 Feet of 1/2-Inch Oxygen-Barrier PEX
The main component is a 300-foot length of oxygen-barrier PEX tubing intended for compatible hydronic heating circuits.
PEX tubing is flexible enough to follow planned radiant floor layouts while providing a continuous pathway for circulating heating fluid. Installers must follow the tubing manufacturer's minimum bend radius and connection requirements.
Two Pipe Bend Supports
The kit includes two bend supports for locations where the tubing must change direction while maintaining an appropriate bend.
These supports can be useful near tubing transitions and other locations specified in the installation design. They do not replace the manufacturer's minimum bend-radius requirements.
100 Foam Staples
The included staples are intended for fastening compatible 1/2-inch PEX tubing to suitable foam insulation.
The original listing describes approximately 36-inch staple spacing as a general guideline. Actual fastening intervals depend on the installation method, tubing layout, bends, insulation material, and manufacturer instructions.
Additional fasteners may be needed for a particular project.
PEX Tubing Kit Product Photo
The original product photograph shows the radiant floor heating tubing kit and its included installation components.
Why Use Oxygen-Barrier PEX for Radiant Floor Heating?
Hydronic radiant floor heating circulates heated fluid through tubing installed beneath or within a floor assembly. The system transfers heat from the circulating fluid to the surrounding floor materials, which then release warmth into the occupied space.
Oxygen-barrier PEX is specifically designed to reduce the movement of oxygen through the tubing wall into the circulating fluid.
This matters because dissolved oxygen can contribute to corrosion in systems containing susceptible ferrous components, including certain pumps, boilers, fittings, and other equipment.
The barrier helps limit oxygen diffusion but does not eliminate every possible source of corrosion or replace proper system design, water treatment, or maintenance.
Planning a 300-Foot Radiant Heating Loop
Proper loop design is one of the most important parts of a successful hydronic floor heating installation.
Before selecting a tubing length, determine the heated floor area, required heating output, proposed tube spacing, manifold location, and the capacity of the circulation equipment.
Estimate Tubing Based on Spacing
As a preliminary estimate, tubing quantity can be related to the floor area and the spacing between adjacent runs.
For example, ignoring manifold connections, bends, and installation allowances:
- 12-inch spacing: Approximately 1 linear foot of tubing per square foot of floor area.
- 9-inch spacing: Approximately 1.33 linear feet per square foot.
- 6-inch spacing: Approximately 2 linear feet per square foot.
These are geometric estimates, not recommended spacing specifications. Actual spacing should be established through the heating design.
A 300-foot coil also needs enough length for the supply and return runs between the heated area and the manifold.
Account for Manifold Connections
Not every foot of tubing will be installed within the heated floor area. The tubing must travel from the manifold to the heating zone and return to the manifold.
Long supply and return runs reduce the amount of tubing available for the active floor layout.
Consider Pressure Loss
Longer tubing loops create greater hydraulic resistance. The acceptable circuit length depends on the tubing dimensions, flow requirements, circulating fluid, pump capacity, and manifold configuration.
Do not assume that the entire 300-foot coil should always be installed as one circuit.
A qualified hydronic designer or installer can determine whether the proposed loop length is suitable for the system.
Using PEX Tubing With Radiant Floor Insulation
Insulation is an important part of radiant floor heating because it helps control the direction of heat flow and reduce unwanted heat loss.
In many slab applications, the tubing is installed above or within an insulation assembly designed for the project.
The included foam staples are intended for use with suitable foam insulation. Confirm that the insulation material can securely hold the staples and that the installation method is approved for the floor assembly.
For related installation materials, browse Barn World's radiant floor heating supplies.
Installing PEX Tubing in a Concrete Slab
Hydronic tubing is frequently incorporated into concrete floor systems, including workshops, agricultural buildings, garages, and other structures where radiant floor heating is appropriate.
Installation requirements vary by project and should follow the approved system design.
Prepare the Floor Assembly
Verify that the subgrade, vapor-control materials, insulation, reinforcement, and other slab components meet the project requirements.
Plan the tubing layout before fastening the first run.
Lay Out the Tubing
Uncoil the tubing carefully and follow the specified layout. Avoid kinks, sharp edges, and bends tighter than the manufacturer's permitted radius.
Maintain the required spacing and keep tubing clear of locations where future drilling, anchoring, or other work could damage it.
Secure the Tubing
Use the included foam staples where they are compatible with the insulation and installation method.
Additional fasteners or different attachment methods may be required around bends, transitions, and other locations.
Protect Tubing at Transitions
Where tubing crosses construction joints or passes through framing or other assemblies, provide protection as required by the system design.
Follow the manufacturer's instructions for sleeves, movement joints, and other transitions.
Pressure-Test Before Covering
Pressure-test the installed tubing circuits using the manufacturer's approved procedure before they are enclosed in concrete or flooring.
Maintain any required test conditions during the placement of surrounding materials and document the results according to the project requirements.
Can This PEX Kit Be Used With Antifreeze?
Some hydronic radiant heating systems use a compatible inhibited glycol solution for freeze protection. However, the correct fluid type and concentration depend on the heating equipment, system components, and manufacturer's requirements.
The original product description mentions RV antifreeze, but that should not be interpreted as a universal recommendation for hydronic heating systems.
Do not add automotive antifreeze or general-purpose RV antifreeze unless the complete heating system and fluid manufacturers specifically approve the formulation.
Use only an appropriate hydronic heat-transfer fluid at the concentration specified for the installation. Fluid selection also affects pump performance, pressure loss, and maintenance.
PEX Tubing Kit Shipping Information
The original listing specifies that the kit ships in two packages.
| Package | Listed Details |
|---|---|
| PEX tubing coil | Shrink-wrapped, approximately 18 lb |
| Bend supports and staples | 12 × 9 × 6-inch carton, approximately 3 lb |
The original listing gives conflicting measurements for the tubing coil, including a likely incorrect diameter in one section. Confirm current package dimensions if they are important for shipping or receiving.
Do You Need the Complete Kit or Tubing Only?
This kit is intended for customers who need a 300-foot tubing length along with two bend supports and 100 foam staples.
If you already have the necessary fastening and bend-support materials, Barn World also offers radiant heat PEX tubing without the kit accessories.
Before ordering, compare your materials list with the kit contents. Additional tubing, fittings, manifolds, controls, insulation, and other system components may be required.
This is a tubing and accessory kit, not a complete radiant heating system.
Frequently Asked Questions
How much PEX tubing comes in the kit?
The kit includes 300 feet of 1/2-inch nominal oxygen-barrier PEX tubing.
Does the kit include fittings?
The listed kit includes two pipe bend supports and 100 foam staples. Manifold connections and other plumbing fittings are not identified as included components.
Does 300 feet of tubing cover 300 square feet?
Not necessarily. Coverage depends on tubing spacing, supply and return runs, and the heating design. At 12-inch spacing, approximately one linear foot per square foot is a preliminary geometric estimate before allowances.
What is oxygen-barrier PEX?
It is PEX tubing manufactured with a barrier that helps limit oxygen diffusion into the circulating fluid. This can be important in hydronic systems containing corrosion-sensitive metal components.
Can I install the entire 300 feet as one loop?
That depends on the tubing specifications, required flow, pump capacity, and pressure loss. Confirm the acceptable circuit length with the system designer or equipment manufacturer.
Are the foam staples included?
Yes. The kit includes 100 foam staples intended for securing compatible tubing to suitable insulation.
Can I use this tubing in a concrete slab?
Oxygen-barrier PEX is commonly used in compatible slab-based radiant heating systems. The installation must follow the tubing manufacturer's requirements and the approved floor assembly design.
Should I fill the tubing with RV antifreeze?
Not automatically. Use only a heat-transfer fluid specifically approved for the hydronic system, at the appropriate concentration. General-purpose RV antifreeze is not universally suitable.
Does this kit include a pump or manifold?
No pump or manifold is identified in the listed kit contents. Those components must be selected separately as required by the heating design.
Can I buy only the tubing?
Yes. Barn World has a separate listing for radiant floor PEX tubing without the accessories included in this kit.
Order a 300-Foot Radiant Floor PEX Tubing Kit
This 300-foot oxygen-barrier PEX kit provides tubing, bend supports, and foam staples for compatible hydronic radiant floor heating installations.
Before purchasing, confirm the required tubing length, circuit design, fittings, insulation, and fastening materials for your project.
For availability, shipping questions, or assistance selecting materials, contact Barn World at (720) 238-2190 or Sales@BarnWorld.com.
Explore additional radiant floor heating products for related installation supplies.
